Case Study: Applying Lean Practices Beyond the Factory Floor

Time: 9:40 am - 10:10 am

Date: Day 3 (21st June)

Synopsis

  • What lessons from the Toyota Production System can be applied to the supply chain
  • Intricacies of a future lean supply chain
  • Challenges in applying lean thinking